RTB Photovoltaic Park Projects
For Sale
Lease & Superficies

Photovoltaic Panels Project of 14,2 MW in Center of Romania

€1,200,000
€84,507 / MWac
Region: Central Romania
9 luni ago
Land Area: 17.00Ha
Type of land: Agricultural category III
9 luni ago
Renewable Energy Type:: RTB Photovoltaic Park Projects
Installed Capacity AC:: 14.20MWac
9 luni ago
Project Price: €1,200,000 Euro
Lease Price: €1,500 / Ha / Year
Reinforcement Cost: €923,500
Grid Connection Cost €105,000
9 luni ago

Photovoltaic Panels Project of 14,2 MW in Center of Romania

 

We are pleased to present an exceptional photovoltaic project for acquisition, offering extraordinary potential at a competitive price. Developed by an experienced company, this project is in the ATR (Technical Connection Approval) stage, with a capacity of 14.2 MW, excellently located in Central Romania. Additionally, there is the option to expand the project over an additional 11 hectares, depending on the buyer’s preferences.

The project is currently in the process of obtaining approvals for the construction permit, removing the land from agricultural use, and paying the advance for the grid connection fee.

The 17-hectare land is utilized by the project owner under a superficies contract with subleasing rights for a period of 35 years. There is also the option to conclude a superficies contract for an additional 11 hectares in the same area.

For more details about this project and the acquisition terms, do not hesitate to contact us.

Project Price: €1,200,000 (€84,500/MW)
Grid Connection Fee: Approx. €1,028,500 (€72,429/MW)
Total Cost (Project + Connection): €2,228,500 (€156,929/MW)
Lease with Superficies Contract (35 years): €1,500/ha/year (€25,500/year)

Listing ID:
15962
Offer Type:
For Sale, Lease & Superficies
Renewable Energy Type:
RTB Photovoltaic Park Projects
FEATURES ATR - Approved
FEATURES Construction Permit In Progress
FEATURES CTES - Transelectrica - Approved
FEATURES Geotechnical Study - Approved
FEATURES OCPI -Situation Plan Approval - Obtained
FEATURES Solution Study - In Place
FEATURES Underground Cable Grid Connection

Write a Review

Post as Guest
Your opinion matters
Add Photos
Minimum characters: 10

    Discover leading Renewable Energy Projects and secure your investments with us. Expert guidance and support at every step.

    Arad City, Revolutiei Blvd, No. 78, Arad County, Romania

    Follow Our Social Media

    © 2024 Voltty I All rights reserved.